Cosmic Electrical Limited Boosts Nepal’s Energy Grid with Bay Expansion
Kathmandu, Nepal: Cosmic Electrical Limited has completed two 132 kV bay expansion works for the Kusma-Lower Modi-New Modi 132 kV Transmission Line Project. This milestone strengthens Nepal’s power transmission network, ensuring enhanced operational capacity and reliable energy flow.
Executed with precision and adherence to international standards, the expansion underscores Cosmic Electrical’s commitment to driving sustainable energy solutions and advancing the nation’s infrastructure.