Middle Tamor Hydropower Project 220 kV D/C Transmission Line
Turnkey 220 kV double-circuit transmission infrastructure connecting the 73 MW Middle Tamor Hydropower Project to Nepal’s national grid.
- Client
- Sanima Hydropower
- Location
- Taplejung District, Nepal
- Service
- Power Transmission Lines
Browse featured projects